Coastal Construction

Vertical Construction Begins For Onda Residences At 1135 103rd Street In Miami’s Bay Harbor Islands

Vertical construction is well-underway for Onda Residences, a 41-unit boutique condominium development along the waters of Biscayne Bay at 1135 103rd Street in Bay Harbor Islands. Designed by Arquitectonica with interiors by creative design masterminds Carlo and Paolo Colombo of A++ Human Sustainable Architecture and Developed by a joint venture between Morabito Properties and CMC Group, the project will deliver fully finished residences ranging from two-to-four bedroom layouts spanning between 1,809 and 3,535 square feet in size, and four penthouse residences measure up to 5,073 square feet – two of which include private rooftop pool decks. The 8-story development is on track to top-off construction in December, with delivery slated for the Fall of 2023. Coastal Construction serves as the development’s general contractor.

Read More

Coastal Construction Breaks Ground On 31-Story AER Luxury Apartment Tower In Downtown Tampa

Coastal Construction has broken ground on the Arts and Entertainment Residences (AER), a 31-story luxury apartment tower in Downtown Tampa. Designed by Cube3 Architects and developed by American Land Ventures and Gazit Horizons, the 346-foot-tall high rise will be located at 300 West Tyler Street, across from the Straz Center for the Performing Arts, offering immediate access to the city’s cultural institutions while providing scenic city and river views to its residents. There will be 334 residential units available in eleven distinctive studio, one, two and three-bedroom floor plans intentionally and carefully designed to meet the demand of the Downtown Tampa luxury rental market, and a separate structure with 13,688 square feet of ground-level retail space and 514-space parking garage above the shops.

Read More

Related Group’s 41-Story Miami Station Tower Is Approved By The FAA To Rise 539-Feet

The Federal Aviation Administration has approved building permits for Miami Station, a 41-story mixed-use tower at 525 Northwest 2nd Avenue in Downtown Miami’s Overtown District. Designed by ODP Architecture & Design and developed by the Related Group, the structure is permitted to rise 539-feet, or 546-feet above sea level. According to construction permits currently under review, Miami Station will yield approximately 730,000 square feet including an estimated 247,000 square feet of office space, roughly 298,000 square feet of residential space across 301 dwelling units, and a podium comprising nearly 6,000 square feet of ground floor retail and 6 levels of parking for over 500 vehicles. FAA building permits were approved on March 25, 2022, and are valid for the next 18 months, meaning Related has from now until October 25, 2023 to begin vertical construction.

Read More

Developers Land Construction Financing For 33-Story AER Project In Downtown Tampa

American Land Ventures (ALV), a Miami-based real estate developer, and development partner Gazit Horizons Inc., the American arm of Israeli-based Gazit Globe Ltd., have landed a construction loan of over $113 million from BMO Harris Bank NA to build AER, a mixed-use development soon to go vertical at 3oo West Tyler Street in Downtown Tampa. Designed by Miami-based Cube3 with Coastal Construction named as the general contractor, the development will yield a 33-story, 346-foot-tall tower with 344 residential units and a connected 10-story structure with over 10,000 square feet of retail space and 504 parking spaces.

Read More

Demolition Permits Issued For 530 Northwest 1st Court In Downtown Miami

Total demolition permits have been issued for an unfinished concrete parking structure at 530 Northwest 1st Court in the Overtown District of Downtown Miami. The 5-story structure has stood on the property since around 2008 and was supposed to support a 29-story office building once known as Logik Tower, which was cancelled due to financial constraints and the recession that proceeded. The interior lot spans 22,500 square feet and is bound by NW 1st Court. on the East, NW 6th Street on the North, and two vacant lots on the West addressed as 525 and 533 NW 2nd Avenue. The permit was approved on February 11, 2022 and marked active by the 14th with The BG Group LLC listed as the general contractor at the cost of $153,930.

Read More

Fetching more...