Kobi Karp Architecture & Interior Design

Residences at Six Fisher Island Breaks Ground, Expected to Complete in 2026

Related Group, along with partners Teddy Sagi, BH Group, and Wanxiang America RE Group, have officially broken ground on the Residences at Six Fisher Island, a highly anticipated residential tower within the exclusive Fisher Island community. Situated on the last development site of the 216-acre island, the project will feature just 50 bespoke residences spread across 10 stories. Coastal Construction is overseeing the build, with completion expected in 2026.

Read More


FAA Approves 637-Foot Height for Edge House Miami at 1825 Northeast 4th Avenue in Edgewater, Miami

The Federal Aviation Administration (FAA) has approved the height for Edge House Miami, a new 57-story condominium tower planned at 1825 Northeast 4th Avenue in Miami’s Edgewater neighborhood. According to an FAA determination letter issued on August 19, the tower can rise 637 feet above ground or 641 feet above sea level. Designed by Kobi Karp Architecture & Interior Design with interiors by Adriana Hoyos Design Studio and developed by Grupo T&C, a prominent developer from Peru, the 734,644-square-foot development will offer around 600 fully finished and furnished residences ranging in size from 375 to 1,242 square feet and include studio, one-bedroom, one-bedroom plus den, and two-bedroom layouts. Features of the units include nine-foot-high ceilings, floor-to-ceiling windows, and, in select residences, private outdoor terraces.

Read More

Miami Blue Lagoon Development Site Slated for Auction Following Foreclosure Ruling

A development site in Miami’s Blue Lagoon area, previously approved for apartments and a hotel, is now facing foreclosure and is set to be auctioned due to a $17.9 million lawsuit. Miami-Dade County Circuit Court Judge Thomas J. Rebull granted the foreclosure judgment on August 10 in favor of TIG Romspen US Master Mortgage against 7 at Blue Lagoon LLC and loan guarantor Caroline Weiss. The judgment is tied to a loan with $13.2 million in outstanding principal and additional interest and fees. The court found that the borrower failed to repay the loan by its maturity date on October 1, 2022, and neglected to pay real estate taxes from 2020 to 2022.

Read More

General Contractor Selected for Next Phases of Marina Pointe in Tampa Bay’s Westshore Marina District

Coastal Construction has been selected to lead the pre-construction planning for the next phases of Marina Pointe at Westshore Marina District in Tampa Bay. This three-tower waterfront development aims to expand upscale residential options in the area. The second tower is planned to commence construction later this year, adding 151  condos ranging from 1,100 to 3,300 square feet. Prices for these one- to four-bedroom residences will start in the high six figures and go up to several million dollars. Additionally, seven Harbour Homes, each approximately 3,300 square feet, will be part of this phase. Marina Pointe, situated on a private peninsula, is a key feature of the 52-acre Westshore Marina District, providing residents with easy access to shopping, dining, green trails, boating, and water sports.

Read More

Fetching more...