Mixed Use

Developers Sign Utilities Deal For Ultra-Luxury 55-Story High Rise 710 Edge In Edgewater, Miami

A utilities deal for water and sewer connections has been signed with the City of Miami for 710 Edge, a 55-story ultra-luxury residential high rise planned for 710 Northeast 29th Street in Edgewater, Miami. Designed by ODP Architecture & Design and developed by 710 Edge LLC – a joint venture partnership between One Thousand Museum developers Kevin Venger, Louis Birdman, Michael Konig, and real estate developer Alex Posth, the newly signed deal includes connections for 100 residential units and 31,418 square feet of retail. The developers executed the deal on August 28, 2022.

Read More


Twin 485-Foot-Tall Towers At 1900 Biscayne Boulevard Approved By The FAA

The Federal Aviation Administration (FAA) has issued building permits for twin 485-foot-tall residential towers at 1900 Biscayne Boulevard in Edgewater, Miami. The developer behind the efforts is Kushner Companies, who’s developing both of these towers along with a third tower at 2000 Biscayne Boulevard, collectively known as the Edgewater Collective. The FAA approved building permits yesterday, and will be valid for the next 18 months. Plans for the Edgewater Collective include 1,265 residential units and 24,000 square feet of retail space across three towers.

Read More

Society Orlando Phase 1 Tops Out At 434 North Orange Avenue In Downtown Orlando

Construction has topped out on Phase 1 of Society Orlando, a two-tower mixed-use development of 28 and 16 stories under construction at 434 North Orange Avenue in Downtown Orlando’s Central Business District. Designed by Orlando-based Baker Barrios and developed by Property Markets Group and Raven Capital Management, the approximately 350-foot-tall first phase will yield 484 residential units atop a massive podium with 33,000 square feet of ground floor commercial space and parking spaces. John Moriarty & Associates is the general contractor with Baker Concrete Construction managing concrete construction for the project, which is located on the northwest corner of the intersection between North Orange Avenue and West Livingston Street.

Read More

Plans Filed For First Portion Of Upland Park Phase One Beside Dolphin Station In Sweetwater, FL

Miami-Dade County planners received an Administrative Site Plan Review (ASPR) application for the first portion of Upland Park Phase 1, a 15-story mixed-use building planned for 11897 Northwest 12th Street in Sweetwater, Florida, dubbed Building L. Designed by Arquitectonica and developed by Terra Group (Terra) under the Terra International Services, LLC, this phase of the development will consist of 384 multi-family dwelling units, approximately 50,000 square feet of grocery and retail, and approximately 853 parking spaces in a structured garage. The 2.575-acre subject property is owned by Miami-Dade County and leased to Terra for developmental purposes, representing a fraction of the overall planned 43-acre Upland Park transit-oriented mixed-use community where the developer is spending $1 billion to build nearly 2,000 residential units, 200,000 square feet of retail, a 12-story hotel, a 16- story office building, medical facilities and a school.

Read More

Fetching more...