Developer Seeks Shoreline Approval For 30-Story Mixed-Use Tower At 1755 Kennedy Causeway In North Bay Village

B Developments under the LGE NBV, LLC filed an application with Miami-Dade County for a shoreline review at 1755 Kennedy Causeway in North Bay Village. The developer is planning a 340-foot-tall mixed-use building designed by Arquitectonica that would stand 30 stories and directly front Biscayne Bay. Plans calls for 473,252 square feet of space including 201 residential units with 32,654 square feet of amenities, a 19,455-square-foot space for a restaurant with a waterfront terrace, a 1,860-square-foot juice bar/coffee bar on the ground floor, 52,358 square feet of office space and a parking structure incorporated into the podium with 408 parking spaces. ArquitectonicaGEO is the landscape architect with Kimley-Horn as the civil engineer.

Read More


Permits Filed For The Crosby Miami Worldcenter At 601 North Miami Avenue

New construction permits have been filed for The Crosby Miami Worldcenter, a 33-story residential building slated for the 27-acre Miami Worldcenter 10-block mixed-use complex in Park West, Downtown Miami. Designed by Cohen Freedman Encinosa & Associates and developed by Related Group and Merrimac Ventures under the DT G Block LLC, the 376-foot-tall will yield 450 fully finished and furnished condominium units spread across 387,355 square feet with interiors by AvroKO, as well as 3,370 square feet of general retail space. Beauchamp Construction Co., Inc. is the general contractor for the project, which is addressed as 601 North Miami Avenue.

Read More


EDEN West Tops Out At 8501 W. McNab Road In Tamarac, Florida

Construction has topped off on EDEN West, two residential buildings located at 8501 West McNab Road in Tamarac, Florida. Designed by MSA Architects and developed by CE Tamarac LLC, a joint venture between Cypress Equity Investments and EDEN Multifamily led by developers Jay Jacobson and Jay Massirman, the 4-story structures will yield 212 garden-style multifamily units, a robust amenity offering and 360 parking spaces on 6.24-acres of land between Northwest 70th Street, North Pine Island Road and West McNab Road. ANF Group, Inc., the project’s general contractor, first broke ground in the Spring of 2021, and is expected to complete construction in Q4 of 2022.

Read More